/ Bomfords

Vegetable processing and packing factory. Polymer screed flooring and Ucrete UD200 to falls, 2500m2 plus drainage installation. New factory built by Bomford Ltd. to replace old premises which had been destroyed by fire. Ground floor area of approximately 2,500 m2 existing concrete slabs with some drain channels in-situ. Additional drainage was installed to accommodate a new factory layout requiring alteration of falls and levels in numerous areas. Ucrete UD200 polyurethane resin floor topping @ 9mm thick was the floor topping chosen for it’s extreme durability. Ucrete WR polyurethane resin render was applied to the new concrete kerbs